Power: Sago has installed
full UPS, Generator, and Battery power to support 4,000 amps
running at 13,200 VAC with full N+2 redundancy. |
Environmental: To ensure outstanding
environmental conditions the datacenter is equiped with 590
tons of Computer Room Air Conditioning and 180 tons of house
air conditioning. |
Network Infrastructure: Sago's
Engineers have designed a Full Cisco Powered Network that
optimizes wire speed technology. |
Network Operations Center: The
2,500 square foot 24/7 manned network control and operations
center ensures all of Sago's systems are continuously available
and support is always outstanding. |
Connectivity: In addition to redundant
dedicated connections to Tampa's largest Carrier Hotel, the
facility also has extensive availability of dark fiber and
several Internet Carriers onsite. |
Size: Sago manages one of the
highest concentrations of Internet bandwidth in a single
site in the US. |
Security: From the basics, such
as 24/7/365 security and onsite network monitoring; to the
advanced, such as strategically placed biometric palm and
thumb scanners, extensive use of physical man traps, dual
authentication access doors, and a state-of-the-art Altronix
powered security system, Sago has taken every possible measure
to address the concerns of even themost security conscious
customers. Sago's latest addition to the security system
is the expansion of our CCTV system to 116 cameras with archived
storage of up to two years for select cameras. |
Physical Isolation: Built
as a "building
within a building", the Data Center is designed to minimize
the risk of natural disasters. |
Support: On-site technicians available
to support any environment, 24 hours a day/365 days a year. |
Fire Suppression: All of the Data
Center space features waterless chemical fire suppression. |